Lileau's first module will be a downtown setting with several late 19th century and early 20th century buildings. From the left to the right these are Artitec's Kaufhaus 14.160 (status: needs detailing and glazing), Faller's Stadthaus 232307 (status: done) and Artitec's Gable 14.140 (still needing a lot of time, but the time-consuming job of cutting out all windows is done!). There will be a fourth, very narrow, building, probably a modified DPM kit.
In front of the buildings, there will be a pavement and single lane road with some parking places and a bus stop. I have planned a tram stop in the front of the module, with platforms on both sides of the double track line, connected with a level crossing. I hope there's space for some trees left after all of this :)
When the track arrives from Japan, I'll probably cut slots in the plywood for it to fit in, in order to get the top of the rails level with the streets. That should give the track a bit more a tram-like appearance.
Subscribe to:
Post Comments (Atom)
I love how the building facades look on your layout. You did a fantastic job!
ReplyDeleteThank you very much Train Spotter! :)
ReplyDelete